Views: 0 Author: Site Editor Publish Time: 2024-12-23 Origin: Site
Design and construction of high and low voltage power distribution Project in Block 8#, Phase 26 of Kunming Kunhai Project:
The construction scope of the project includes but is not limited to:
1. Outdoor part: including outdoor cables, working Wells, etc.;
2. Power room part: including high voltage cabinet wiring, high voltage equipment, low voltage equipment, transformer, busbar trough, contact cable installation and other safety equipment;
3. Electrical room lighting: including lighting engineering, fans and electrostatic floor.