The third phase of Zhaoqing New City is located at the junction of Lantang Fourth Road and 321 National Road, Duanzhou District, Zhaoqing City.
The project includes (1-8) high and low voltage power distribution engineering design and construction. The scope of the project contract includes but is not limited to:
1. High-voltage dedicated line project: electrical system installation project before the municipal power supply system is transferred to the main power room of the park.
2, high and low voltage distribution project: high and low voltage distribution room high and low voltage equipment and related cable installation and auxiliary equipment installation project.
3, special engineering: special distribution room and its auxiliary equipment installation project.
4. Special outlet works: All electrical installation works from the special electrical room to the basement and ground public part lighting distribution, garden greening distribution, property management room lighting, commercial distribution, basement and ground power system distribution level 1 electrical box and power room switching box.
5, elevator power distribution project: permanent elevator power installation project.
6, low-voltage outlet engineering: low-voltage cabinet outlet to residential meters electrical engineering (one household one meter).