Design and Construction of 10kV Power Distribution Project for Kunming Fengdong New Material Technology Center The scope of this project contracting includes, but is not limited to:
1. Outdoor part: It includes outdoor cables, switch stations, cable trenches and working wells.
2. Indoor part: It includes the outgoing lines of high - voltage switchgear, installation of high - voltage equipment, low - voltage equipment, transformers, cable trays, bus ducts and connecting cables in each substation. It also includes the construction of substation grounding devices, the foundation of switch cabinets (including anti - static floors), the installation of combined cabinets, lighting construction, comprehensive environmental detection, mimic panels, signs and labels, ventilation devices and other safety tools.
3. Generator part: It includes the distribution equipment, and the laying of cable trays and cables connecting the equipment in each substation.