Design and Construction of 10KV Power Distribution Low - voltage Outgoing Line Project for Plot 7 - 2 of Spring City Time Garden, Phase 15 of Kunming Kunhai The scope of this project contracting includes, but is not limited to:
1. Low - voltage outgoing line part: Cable laying from low - voltage switchgear to the primary power box and installation of the box body.
2. Generator part: Cable laying from the low - voltage switchgear in the generator room to the primary distribution box and installation of the box body.